Making operation manual

Open operation manual.
 

 
Please set "operation name" and "date".
 

 
Set the operation target host.Please change 「target host list」 sheet and check the target hosts.
 

 
Please input "outline" and "Plan start time" and "Plan end time" in "outline" sheet.
"Outline" is used for sheet name, "Plan start time" and "Plan end time" are used for time chart.
If you check "Switchback", it will be recognized as a switchback operation.
 

 
Set work details. Please switch sheets.
 

 
Please set "hostname" "outline", "command", "check method". The summary items are as follows. 
 
"Collect info" ... Execute the command list set in "Login information". 
"Configuration check" ... Specify the command in the "Command" column to collect information.
You can select "Text" or "Diff" as the confirmation method after gathering information. 
 
"Text" ... Open the log acquired by the text editor. 
"Diff" ... Set the "Diff file" column. Compare the acquired log with the file selected in the "Diff file" column with the Diff tool. 
 
"configuration change" ... Submit the configuration file (another sheet) specified in the "Command" column. 
"Save data" ... Executes "save data sequence" set with "login information". 
"Manual operation" ... You can perform tasks manually rather than automatically. Only popup will be output. 
 

 
Please set "Contents" and "Check" in the operation manual.
It will be entered automatically, but please fix according to your work.
 

 
Please select "config sheet".
 

 
Please set input configuration.